D-Link Notes
Alteeve Wiki :: D-Link Notes |
Notes on setting up D-Link switches for high availabilty.
DGS-3120 Series
- Ensure you've updated the firmware to R2.00.010 or higher.
- Make the stacking master static;
- System Configuration -> Stacking -> Stacking Mode Settings.
- Change 'Force Master Role' to 'Enabled'.
- Enable flow-control;
- System Configuration -> Port Configuration -> Port Settings.
- Set 'Flow Control' to 'Enabled' for all ports on both switches.
- Confirm with dmesg |grep -i flow and look for e1000e: eth0 NIC Link is Up 1000 Mbps Full Duplex, Flow Control: Rx/Tx. If any interfaces show Flow Control: None, it's not setup right.
- Setup VLANs for the SN and IFN (leave the BCN on the default VID 1).
- L2 Features -> VLAN -> 802.1Q VLAN Settings
- For each VLAN;
- Setup a static trunk for the two uplink ports;
- L2 Features -> Link Aggregation -> Port Trunking Settings.
- Use 'MAC Source' algorithm.
- Set a unique Group ID.
- Set the 'Type' of "Static".
- Set the master port (usually 1:24).
- Change 'State' to "Enabled".
- Check to enable the appropriate ports (usually 1:24 and 2:24).
- Save your changes!
- 'Save' -> 'Save Configuration / Log'.
- Change 'Type' to "All" and click 'Apply'.
- Thanks to Fabio Massimo Di Nitto for helping to sort out this recipe!
Any questions, feedback, advice, complaints or meanderings are welcome. | |||
Alteeve's Niche! | Alteeve Enterprise Support | Community Support | |
© 2025 Alteeve. Intelligent Availability® is a registered trademark of Alteeve's Niche! Inc. 1997-2025 | |||
legal stuff: All info is provided "As-Is". Do not use anything here unless you are willing and able to take responsibility for your own actions. |