D-Link Notes: Difference between revisions

From Alteeve Wiki
Jump to navigation Jump to search
(Created page with "{{header}} Notes on setting up D-Link switches. = DGS-3120 Series = # Ensure you've updated the firmware to R2.00.010 or higher # System Configuration -> Stacking -> Stacking ...")
 
No edit summary
Line 1: Line 1:
{{header}}
{{header}}


Notes on setting up D-Link switches.
Notes on setting up D-Link switches for high availabilty.


= DGS-3120 Series =
= DGS-3120 Series =


Confirmed
# Ensure you've updated the firmware to R2.00.010 or higher
# Ensure you've updated the firmware to R2.00.010 or higher
# System Configuration -> Stacking -> Stacking Mode Settings. Change 'Force Master Role' to 'Enabled'.
# System Configuration -> Stacking -> Stacking Mode Settings. Change 'Force Master Role' to 'Enabled'.
Testing
# System Configuration -> Port Configuration -> Port Settings. Set 'Flow Control' to 'Enabled' for all ports on both switches.
## Confirm with <span class="code">dmesg |grep -i flow</span> and look for <span class="code">e1000e: eth0 NIC Link is Up 1000 Mbps Full Duplex, Flow Control: Rx/Tx</span>. If any interfaces show <span class="code">Flow Control: None</span>, it's not setup right.
# Create VLANs for the bonds, 'untagged', disable advertisement (666 for SN, 71 for IFN, default/1 for BCN).
# Setup Trunking; L2 Features -> Link Aggregation -> Port Trunking Settings. Set 'Type' to 'Static' and set switch 1 port X as the master. Create a trunk for each node's bond.


{{footer}}
{{footer}}

Revision as of 19:11, 9 July 2012

 AN!Wiki :: D-Link Notes

Notes on setting up D-Link switches for high availabilty.

DGS-3120 Series

Confirmed

  1. Ensure you've updated the firmware to R2.00.010 or higher
  2. System Configuration -> Stacking -> Stacking Mode Settings. Change 'Force Master Role' to 'Enabled'.

Testing

  1. System Configuration -> Port Configuration -> Port Settings. Set 'Flow Control' to 'Enabled' for all ports on both switches.
    1. Confirm with dmesg |grep -i flow and look for e1000e: eth0 NIC Link is Up 1000 Mbps Full Duplex, Flow Control: Rx/Tx. If any interfaces show Flow Control: None, it's not setup right.
  2. Create VLANs for the bonds, 'untagged', disable advertisement (666 for SN, 71 for IFN, default/1 for BCN).
  3. Setup Trunking; L2 Features -> Link Aggregation -> Port Trunking Settings. Set 'Type' to 'Static' and set switch 1 port X as the master. Create a trunk for each node's bond.


 

Any questions, feedback, advice, complaints or meanderings are welcome.
Alteeve's Niche! Enterprise Support:
Alteeve Support
Community Support
© Alteeve's Niche! Inc. 1997-2024   Anvil! "Intelligent Availability®" Platform
legal stuff: All info is provided "As-Is". Do not use anything here unless you are willing and able to take responsibility for your own actions.